Temporary exploratory well to provide important knowledge about the subsurface
Following completion of the seismic surveys, the next step is an exploratory well. This is part of the work programme Harbour Energy has committed to carrying out over the coming years.
The purpose of the well is to retrieve core samples and take measurements through the subsurface’s many layers, down to a depth of over three kilometres. Together with the results of the seismic survey, the results from the exploratory well will form the basis for Harbour Energy’s decision on whether to apply to the Danish Energy Agency for a permit to establish a geological CO2 storage site.
An exploratory well, also known as an appraisal well, is a temporary activity in which the total project period – from establishing the drill site to restoring the land – lasts 9-12 months. Once the work is complete, all installations are removed and the area is returned to its original use.
The well will be drilled at a temporary drill site set up on private farmland near Fårup. The drilling rig stands 55 metres tall, while the wind turbine on the same plot stands 130 metres tall. The well is expected to reach a depth of more than 3,000 metres. Along the way, several sections of steel casing and cement are installed to isolate the different geological layers and protect both the subsurface and groundwater.
Randers Municipality has approved Harbour Energy’s project description for the temporary well and issued the necessary permits. Throughout the project, we remain in close contact with authorities and neighbouring residents.
We want to continue building on the direct, personal contact, accessibility and visibility we established during the seismic survey.
Follow the project here on this page, where you can sign up for our newsletter. We’re also on LinkedIn, and we’ll be holding community-facing activities in the local area throughout the project period.
You’re also always welcome to contact us at kontakt@greenstore.dk